Wednesday, October 16, 2013

Webservices Security: Potential Threats to Combat

Web Services is one of the primary method of implementing SOA in highly distributed enterprise computing environments where not only the enterprise applications need to be integrated with internal applications, but also with the external systems built and operated by various business partners. That requires such services exposed beyond the trust boundaries of the enterprise and thus increasing the security threat landscape.

Securing webservices is more complicated than any other end user systems, as the webservices are built as the conduit between systems rather than human users. Most of us are very familiar with the first line of defense, namely authentication, data integrity, confidentiality and non repudiation. These are certainly critical security concerns, but there are well established tools and practices that help address these security issues. But, this it not just be enough to be contempt with solving these concerns, as the services are no longer constrained within the trust boundaries.

While other types of applications have executables that act as an outer layer and protects the application's internals, webservices don't have such outer layer and thus expose the internals to potential unforgiving hackers on the internet or intranet. Testing and securing webservices require a toolkit with abilities to act like a client or for that matter its proxy and being able to intercept, transform or manipulate the messages that are being exchanged. Having said that, the toolkits alone would not guarantee a complete solution to combat the security exposure of the webservices. There need to be an understanding of the application, context, trust boundaries etc, which will help to enumerate the potential threats that need to be managed and then use the toolkits.

In this blog, let us have a look at the potential threat categories beyond the first line of defense that an organization should be aware of and be prepared to combat. As always, the attempt is to come up with the most significant threats and not to produce an exhaustive list of such threats. Determination of the specific threats under each category requires an analysis of the application and its internals in line with the trust levels.


Privilege Escalation

Virtually all attacks attempt to do something the attacker is not privileged to do. The hacker wants to somehow leverage whatever limited privilege he has, and turn it into higher ("elevated") privilege, as a result of potentially flawed authentication and authorization mechanisms. Sometimes, hackers would exploit vulnerabilities in the internal components of the service, be it custom coded or third party components and thus gaining privileges for remote code execution or database manipulation. It is obvious that the consequences of such breach could be severe leading to financial and non financial damages.

While the protection for such vulnerabilities depends on the specifics of the application and its architecture, as a general best practice, the authentication and authorization needs of each of the internal components shall be carefully established based on the least privilege principle, by considering additional contextual information like the client, location, or network in addition to the basic credentials and by implementing multiple levels of authentication within the service components can alleviate this category of threats. When third party components or run times are used, it is important to constantly apply the security patches that the vendors may release.


Denial of Service

The interoperable and loosely-coupled web services architecture, while beneficial, can be resource-intensive, and is thus susceptible to denial of service (DoS) attacks in which an attacker can use a relatively insignificant amount of resources to exhaust the computational resources of a web service. Denial of Service attack is aimed at causing impact on the availability of the underlying network, compute or storage resources for the legitimate service consumers. Given that webservices are typically used in high availability enterprise integration scenarios, even a smaller magnitude of DoS attach could cause sever disruption in all the connected systems and leading to breach of SLAs with partners and thus at times leading to financial damage as well.

The effects of these attacks can vary from causing high CPU usage, to causing the JVM to run out of memory. Clearly the latter is a critical vulnerability. Protection for DoS can be implemented at different levels with a view to ensure legitimate of use of the underlying resources. Some of the techniques used to combat DoS attacks are to implement various algorithms to restrict access to critical internal components to legitimate requests and rejecting the rest. For instance, the input message size limits can be validated in line with the speciific service method and if the requests carry an unusually large xml messages than expected, such requests can be rejected at the network layer itself. Tools and appliances are available to combat the DoS attacks, but how such tools and appliances are setup and configured would depend on the specific needs.


Spoofing

Spoofing attacks are successful when one entity in a transaction trusts another entity. If an attacker knows about the trust, they can exploit it by masquerading as the trusted party. This can also be masquerading the additional contextual information which is used in authentication or in request processing. The most common of such information are SOAPAction and client IP. There are various ways to exploit credentials or spoof the source of messages. These include credential forgery, session hijacking and impersonation attacks. The services shall be designed to appropriately validate such information in isolation and in combination with other related information, so as to establish the request is legitimate.

Repudiation

An important web services security requirement is nonrepudiation. This requirement prevents a party from denying it sent or received a message. The way to implement this is using Xml Digital Signatures. For example, if I sent a message which is signed with my private key, I cannot later deny that I sent it. This concern arise when the web service does not bind the client to their actions using appropriate techniques or due to flawed implementation of auditing and logging requirements. Data inconsistency is one of the common outcome of this threat and could lead to sever damages to the enterprise.

A combination of the protection measures against various threat categories would help combat this threat. For instance, an adequate protection from spoofing, protecting the messages while in transit coupled with appropriate logging and audit implementations would help minimize the risks arising out of this threat.


Information Privacy

As web services are typically implemented as part of a complex system and have access to a large amount of potentially sensitive information, it is important to ensure that access to the information is restricted. The transfer of the data should also be secured to prevent eavesdropping and sniffing threats. Privacy or confidentiality concerns with webservices is no different than that in any other system. As such, the information disseminated through the information has to be reviewed in line with the organization's information sensitivity policy and apply policies and rules to ensure that when to allow a specific request have access to such information. This will involve not only appropriately defining the authorization rules for the clients and users, but also carefully considering the information or parameters that are received as part of the request message


Message Tampering

Webservice messages, both request and responses if not appropriately protected can be tampered using various attack methods. Web services being a component of a complex distributed enterprise system with integration with multiple partner systems throws open the possibility of message tampering as it is exposed beyond the boundaries with multiple communication paths. Attacks under this threat category include man-in-the-middle attacks and implanting trojans and malwares. As with the other threats, this can also cause severe damages. Compromise under this category may also mean a compromise in one or more other threat categories. For instance, a tampered input message might lead to spoofing of identity and thus compromising the information privacy, etc.


To conclude, as the protection measures are evolving on the one side, newer threats are also emerging and the security professionals need to have a continuous engagement, and have an appropriate security or threat management framework implemented to combat the existing and emerging threats. Periodical security audits shall be supplemented with a formal security testing with necessary toolkits in place. All said and done, the extent of protection should depend on the organization's risk policies and risk appetite, the critical nature of the webservices and the trust boundaries.


Sunday, March 31, 2013

Software Complexity - an IT Risk perspective

IT risk management predominantly focuses on IT Security though there are other category of IT risks which are less known. Software complexity is such an important unusual or unpopular IT risk. Basically, software complexity is one of many non functional quality attributes, which in most cases is ignored completely, leading to associated risks occurring and thus leading to financial and non financial impacts on the business entity. In this blog, let us try to understand the software complexity in the perspective of IT risk, and shed some light on whose baby it is and how to manage or control it.


What is Software Complexity?


Let us first understand what is Software Complexity. The simple definition of complexity is how hard a software is to understand, use and / or verify it. Complexity is relative to the observer, meaning that what appears complex to one person might be well understood by another. For example, a software engineer familiar with the systems theory of control would see good structure and organization in a well-designed attitude control system, but another engineer, unfamiliar with the theory, would have much more difficulty understanding the design.


Basili defines complexity as a measure of resources expended by a system while interacting with a piece of software to perform a given task. In terms of the end users, this could be understood as the usability. i.e. how much time the user needs to spend accomplish a task using a software and how much training is required to get familiar with it. Similarly in terms of the developers, this could be understood as maintainability i.e. how easy it is for new developers to understand and work on it to further improve it or to address issues. Again, in terms of the IT infrastructure team, this could be understood as the level of efforts needed to have it deployed and support it, which again should be considered under maintainability.


Why Complexity is an evil?


Complexity as the above definition goes, requires more resources to be expended than normal and thus is counter productive. We have numerous best practices, standards and frameworks that advocate for eliminating complexity, but somehow it creeps in and pose as a challenge in most cases. The consequence of software complexity as we have put it above clearly is risk, and it could be even be a business risk, when we look at it in the end user perspective. The following is a sample list of risks that could arise due to software complexity:


  • Complex software is difficult to verify and validate and this could lead to new defects surfacing even after months of its production use. Depending on the severity of the defect, the impact could be low to very high.
  • Software complexity could render the business processes inefficient, as the end users may have to spend more time in using the software to execute certain business processes, which could result in losing the competitiveness and thereby losing market.
  • Failure to consider the downstream complexity by the development teams could result in a state of ‘project successful, but mission failed’. i.e. even if the project teams have successfully completed the project, the resulting software product might be complex enough to render it useless thereby rendering the entire investment in the project to be loss. 
  • Post production support will always be challenge as it is difficult to retain trained and capable resources to maintain the complex software and this is a most common risk that enterprises are continuing to battle with.
  • Complexity in deploying and distributing the software is another area of concern for the infrastructure team. Sometimes, such complex software might demand so much of computing resources wherein the costs of such hardware and other infrastructure resources might outweigh the perceived benefits out of using such a software.


The above list is only illustrative and the list could be even bigger and I would let you come up with more such consequences in the form of feedback.


Measuring Software Complexity


To be managed or controlled, we should be able to measure the complexity. While the discussion of measures of software complexity is out of the scope of this blog (I might work on to write another blog on measuring software complexity), at a high level, the following measures can be used.



Complexity Metric
Primary Measure of …
Cyclomatic complexity (McCabe)
Soundness and confidence; measures the number of linearly-independent paths through a program module; strong indicator of testing effort
Halstead complexity measures
Algorithmic complexity, measured by counting operators and operands; a measure of maintainability
Henry and Kafura metrics
Coupling between modules (parameters, global variables, calls)
Bowles metrics
Module and system complexity; coupling via parameters and global variables
Troy and Zweben metrics
Modularity or coupling; complexity of structure (maximum depth of structure chart); calls-to and called-by
Ligier metrics
Modularity of the structure chart



Controlling Software Complexiity

As we have seen in the definition section, complexity is context sensitive. i.e. the same software may be viewed at different complexity level by different class of users. While this is a challenge for the developers, they find it as a useful shelter to stay away from addressing it. Developers primarily depend on the business system analysts, who in most cases play the role of representing the end users and when they fail to see the complexity which the end users would, development teams are mislead. In one of the project that we have been working on, the business system analyst, who was also tasked to triage the defects logged by end users, simply turns down such defects suggesting the users to learn to use the system. This definitely goes against controlling the complexity there by managing the IT Risk.

Controlling Software Complexity calls for adopting certain practices in the areas of architecture, design, build, testing and project management some of which are listed below:

  • Set the expectations: Overly stringent requirements and simplistic hardware interfaces can complicate software and a lack of consideration for testability can complicate verification efforts. Cultivating awareness about the downstream complexity and how detrimental the complexity could be, if ignored, would help in getting the much needed team collaboration and commitment.
  • Requirement Reviews: Ambiguous software requirements has been a cause of complexity, as many times, the developers tend to assume things. Similarly certain requirements may be unnecessary and could be overly stringent, which can be spotted in the review process leading to reduction in complexity.
  • Domain Skills: Having the relevant product or domain skills will go a long way in reducing downstream complexity as the development team would be familiar as to how the industry is handling such requirements. 
  • Architecture Reviews: A good architectural design will go a long way in reducing the downstream complexity. Design and architecture reviews early on would go a long way in addressing this need. It would even make sense to have an Architecture Review Board comprising of representatives who will be able to use their expertise in the specific areas and spot problem areas.
  • COTS: Third party libraries usually termed as COTS (Commercially available Off the Shelf) components often come with unneeded features that adds to the complexity of the software. It is important to make a careful and thoughtful decision in case of COTS.
  • Software Testability: Design the Software with testability in mind, so that the complexity can be verified by the QA teams.

Conclusion:


Much of the plans for mitigating the software complexity risk revolves around the software acquisition or software development process. This calls for a close co-ordination and collaboration between the IT Risk managers and the Development teams. Though risk management is well understood as an important function of the project managers, how well the risk of complexity is managed is still questionable. The project managers are primarily concerned on those risks that might impact the project success and fail to consider those like the complexity that emerge downstream post project. It has also been observed that reduction of complexity is an important characteristic of disruptive innovation. Innovations emerge disruptive, when it addresses the complexity in already existing products or systems and thus being able to capture market segments one after the other in it course to the top of the cliff.

Saturday, March 23, 2013

Surviving Disruptive Innovations


I have recently made a presentation on Disruptive Technologies at the Chennai Chapter of ISACA. While chose the topic in the context of presenting a picture of the pace at which the disruption is happening in IT world and what are the upcoming Disruptions to watch out for. But As I was preparing the agenda and content for the presentation, I was curious to find out how successful enterprises are managing rather surviving disruptions and in the process have stumbled upon some of the research work done by Clayton Christensen.


It was interesting to observe few things from his theory, which are the following:


Good Management principles would not be of great help in managing or surviving the disruptive innovations. Christensen sites the examples of how Toyota came up disrupting General Motors. He sees a pattern in the happening of disruptions in the form of an S curve, where the top of the curve is a cliff. Leaders / Leadership teams follow the bese management principles to climb up the S Curve and when they reach top they just fall off the cliff.


Extendable core is the key enabler of of innovations becoming disruptive. The potential disruptive innovations would appear as if it is insignificant in terms of the competitive capabilities of the incumbent’s existing products and thus tempting the incumbent to ignore it. But having an extendable core within it, the new entrant quietly enhances its capabilities and slowly get into the mainstream market of the incumbent and then disrupting a whole market resulting in driving the big and well managed incumbents out of the market.


Emerges from where it is least expected. For example, we now find it very comfortable to use a smartphone to various jobs which otherwise were performed by some special purpose devices. Examples include GPS devices, Digital Cameras and even PCs. While GPS device manufacturers still believe that GPS feature of Smartphone is not a threat for them as the special purpose GPS devices have certain unique advantages, which Smartphones don’t. But be reminded that the smartphones have the extendable core and can easily address this capability gap and soon GPS devices will be a thing of the past and we are already seeing the signs of it.


While there are many other interesting observations to note, I would leave it for you to find those out. I was then curious to look into the cases of disruptions that happened in the past. the following three cases of disruptions were of interest to me:


Kodak: Kodak ruled the photography market for a whole century. Their management as all the best qualities and were praised in all respects. Kodak has many innovations to its credit and have many firsts as well. With such a performance it has recently gone into bankruptcy and has sold its patent portfolio, which included close to 1000 patents to salvage some value. It is natural for us to think that the emergence of Digital Cameras would have disrupted Kodak in a big way. But as many would know, Kodak knew that digital era is emerging and they were the first to introduce a Digital Camera in the 1970s. But then what went wrong and how did they miss to sustain that innovation and stay alive in the market? Kodak has been believing till early 200 that the Photographic films wouldn’t die so soon. The other interesting observation out of Kodak’s failure is that with a heavyweight team of experts, sustaining innovation is really expensive and the outside view is most likely ignored.


That’s where the management tend to give up on some of the innovations as the time and investment in it may not worth it as they are making decent business with their current line of products. The situation is different for new entrants as the startups usually break the rules of convention and are in a position to pursue such innovations relatively a lot cheaper and also in an progressive manner. Startups usually start to focus a market which is ignored or to which the incumbents don’t pay much attention and there by not drawing the attention of the incumbents till a point when it will be difficult for the incumbent to respond to.


NOKIA: Nokia came big in the cellular phone, but failed to get its innovation strategy right with the smartphones. Even in NOKIA’s case, its research team came up with a prototype of smartphone with internet access and touch interface, way back in 2003, but the management, again going by good management principles, citing the risk involved in the product being successful and the very high cost of its development has turned down the proposal to pursue this plan further. Exactly three years later Apple launched its iPhone.


NetFlix: Netflix case is a little different. Netflix has been very successful in its DVD Rental business and in fact has seen the emergence of disruptive innovations in the form of streaming videos. It even responded to it by pursuing its research activities in that direction and has developed a service of streaming videos. What went wrong according to analysts is that it got is business model and pricing wrong as it combined both the traditional service and the digital streaming service as a bundle and increased the pricing. Ideally it would have been more appropriate to have offered the digital streaming under a different brand or as a separate service, as the surveys indicated that the DVD rentals still account for 70% of the total video sales in the US.


Now, given that just good management principles don’t help in sustaining or surviving the disruptive innovations, what should the organizations do to stay alive in todays world where IT has enabled the disruptive innovations to emerge with much faster pace leaving very little time for the incumbents to respond to. We also keep hearing that the “break the rules” is the way to go to foster innovation. While disruption is always seen as a risk to be managed, how well enterprises come up with the right risk mitigation and contingency plans to handle the risk of disruption is still a mystery.


You may check out my presentation on the subject at Slideshare and feel free to share your views and thoughts on this topic. You may google to find out some of the great articles and papers on the theory of disruptive innovation by Clayton Christensen. You will also find some good video lectures of his on YouTube.

Sunday, September 30, 2012

Building Secure Applications

The awareness on security has increased manifold and thanks to the frequent news headlines on security breaches and compromises leaving organizations with heavy damage and / or loss. The board has started realizing that information security is one of the primary causes of most of the IT Risks that their organization has to mitigate or to be ready to face. But the application design and development processes has not seen significant change to ensure that the delivered application is secure and would help the organization bring down the risk exposure.
 
Most of the software engineers and architects involved in application design and development still have very less security awareness and they believe that that security is something that the IT Infrastructure team will take care of. On the other hand, the IT infrastructure team believes in the investment they would have made in robust security tools and expect that they have done their part to protect the organization and pass on any application specific security issues back to the development teams. Then, whose responsibility it is to ensure building a secure application?
 
This is where an independent, enterprise wide security consulting team needs to extend the security consulting to various project teams within the organization. But still, this will not solve the problem completely, as it is for the development teams to be security aware and design and build security applications. 
 
Here is what the security consulting team can offer to the project teams:
 
Pre-project security reviews: This helps the decision makers to be aware of what security threat landscape that they are going to be dealing with upon implementation of the project. This could even have an impact on the project costing as additional cost might have to be incurred to mitigate the security risks that this project may bring on and in most cases it is not just one time investment and it has to be recurring operating expenses as well. This helps the organization to make informed decisions considering the extent of impact on the organization’s risk exposure.
 
 
Design level security reviews: Like in case of software quality, earlier one spot the security concerns, it would cheaper and easier to factor in the mitigation plans. At this stage, the security consulting teams can help the project teams in the following ways:
  • A high level evaluation of the security concerns that the design could expose and suggest possible security controls to mitigate such concerns.
  • Equip the project stake holders with necessary information associated with the identified security concerns, so that they can take better risk management decisions.
  • Extend guidance to the project teams on the choice of controls and solutions that might best address the security concerns.
  • Perform research and exploration on any the technology or feature is quite new and innovative which could potentially open a new thread landscape
  • Offer training to the design and development teams about the most common security vulnerabilities and the attack patterns, so that they design and build counter measures early on.
Implementation Security Reviews: Security consulting team offers to perform the reviews and verifications in the later phase of the application development, so that vulnerabilities if any exist may not slip through to production. Typically the services offered by the security consulting team are one or more of the following:
  • Ensure that the security concerns identified in the design review is fully addressed.
  • Perform security specific reviews on the code and this could be on a sampling basis, depending on the acceptable risk level of the application.
  • Use automated tools that will examine the code and / or the packaged component or application.
  • Review the security specific test cases as created by the software testing team and suggest additional test cases to ensure better coverage in the security testing.
Having a security consulting team will not just be enough to build secure applications. The Software Engineering Process which defines and describes the approach and methodologies used for project execution should also mandate for practising and consuming the services of the Security Consulting teams and their review reports should be identified as entry and exit criteria for various phases of the application development.
 
Security education is also required to ensure that the project team is aware why security is so important for the organization. The following measures towards security education would help the teams to design and develop secure applications:
  • Include a module of security education in the employee induction program, so that every new employee is oriented towards the security needs of the organization.
  • Offer in-depth security training to architects and select software developers and ensure that every project team has at least couple of such trained resources. 
  • Ensure that the coding guidelines document also factors writing secure code.
  • Hold periodic training sessions where in addition to security related presentations, recent security review findings and or defects found during the security testing can be taken up for discussion and in the end come up with solutions to prevent such issues creeping in.
  • If the organization publishes a periodic news bulletin, ensure that security is a mandated section in it and use it to publish security related updates.
As it can be observed, security is not just one person or department’s responsibility and it should be the outcome of collaborated efforts of concerned teams with the common goal to build a secure application. The security consulting team can also be external to the organization, i.e. this function can be outsourced to security consuling firms who would be specializing in the area of application security practice.

Saturday, June 23, 2012

The pressure points of Cloud Adoption


The values and benefits of cloud adoption is increasingly clear and well known. Not to be carried away with these values and benefits, it is important to identify and be aware of the pressure points that the Cloud Adoption brings in as called out by ISACA in its white paper titled as ‘Guiding Principles for Cloud Computing Adoption and Use. Essentially the differences in technology itself and its use impacts the way IT is governed and managed and the management’s reaction to these impacts brings on the pressure points as well, which need to be managed.

Differences such as change in cost allocation from capital to operational may have consequences that may not apparent at the beginning. For instance, contracting for a cloud based software would be an operational spend and may have a lower cost of entry and thus, such decisions may fall outside the review and approval process. While in most cases, the pressure points are to be managed as risks, these are not necessarily risks.

Speed and Agility

The time-to-market is a driver for cloud adoption as solutions to meet market needs would be available more quicker at lesser cost though there could be gaps in meeting the exact requirements. This agile exploitation in a reduced time frame puts greater pressure on enterprise, in which culture, process, and human factors related to technology have been developed to support longer development cycles and long term technology use. This pressure when not handled appropriately could result in increased risk level in the following areas:

  • An unbalanced prioritisation of value over trust in technology solution choices
  • Missed opportunities when other alternatives are not considered
  • Recovery mishaps because fallback positions are not fully exploited
  • Missing functionality if full requirements are not identified
  • Increased long-term costs due to reliance on multiple short-lived solutions
  • Reduced performance when enterprises are hesitant to introduce new solutions because of existing technology investments


Changing Boundaries

The reliance on cloud providers calls for change in the roles and responsibilities within the enterprise and transfer certain responsibilities to outside parties. Contracts and SLAs with service providers attempt to assign accountabilities, but governance dictates that the enterprises themselves, their board and management remain accountable. With this, the locus of decision making changes from governance functions to business line leaders. This change in the organizational boundaries can put greater pressure on enterprises. The risk outcomes out of this pressure point could be:

  • Role confusion when accountabilities and responsibilities are not clearly defined
  • Diminished effectiveness when decisions are made without engaging in a wider consideration of trust and value before cloud acquisition
  • Failure to satisfy constituent and end-user expectations for protection and privacy
  • Project delay and increased costs due to the need for personnel with governance responsibilities to revisit cloud plans
  • Unclear specifications of provider responsibilities and accountabilities in SLAs
  • Incomplete information being provided to board members and senior management


New Technologies and Technology Expectations

Cloud follows a sequence of disruptions in how technology is viewed, integrated into organizational strategy and managed and in how IT risks are identified and managed. Areas of high pressure can result when strategy and enterprise architecture do not consider the unique qualities of cloud computing and when enterprise processes and procedures do not easily adapt to changes made possible by cloud computing. The following risks could be the outcome of this pressure point:

  • Missed opportunities to extract value from the integration of cloud and internal systems
  • Increased vulnerability from incompatibilities and inconsistencies between cloud and internal systems
  • Less than expected results when human factors are not considered in the design and integration of cloud services and infrastructures
  • Levels of organizational performance that do not meet expectations because cloud solutions do not fully support organizational processes
  • Levels of technical performance that do not meet expectations because processes do not take full advantage of cloud capabilities


Level Playing Field

Cloud computing removes the advantage that large enterprises have traditionally had in terms of availability of technology specialists and technical sophistication. Smaller enterprises now have the ability to leverage the cloud services and use technology sophistication that large enterprise used to enjoy. This brings the small and medium enterprises on an equal position with much larger enterprises. This level playing field can have an impact on the strategy and its implementation. Ignoring this impact can result in increase of risk levels in the following areas:

  • New entrants claiming a segment of traditional market dominance
  • Strategies that do not address competitor capabilities
  • Less-than-expected benefits received from technology-dependent solutions


Utility Services and Service Supply Chains

With cloud computing, where computing is viewed as a utility, focus is shifting to the value and benefits obtained from such utilities. Agile enterprises benefits from solutions that can be used as needed and discarded when they no longer provide value. This view of computing as a utility and the delivery of solutions supply chain of information systems solutions puts greater pressure on enterprises that contain a culture that is not accepting of utility solutions, a structure that does not facilitate cooperative planning and processes that cannot take advantage of computing solutions provided as supply chain of utilities. Ignoring this could result in the following risk outcomes:

  • Over-investment of resources in planning and building internally developed information system solutions
  • Less-than-optimal results when value-producing cloud utilities are missing from the total solution
  • Duplication of effort when specialist services available through cloud providers are not integrated as part of system management
  • Less-than-expected results when utility components are not integrated into and managed as an information system capability supply chain


In the white paper, ISACA suggests that enterprises follow a six guiding principles that can help illuminate the path for cloud adoption. Click here to download the complete white paper which is available for registered (free registration) users.

Saturday, June 16, 2012

Key risk areas that can impact the project success


Till recently and to some extent, even now, some of us don’t want our insurance advisor talk about our own risk of life. It has been the belief for some not to think or talk about the risk of losing life. However, things are changing and most of us today are managing personal risks well by atleast transferring the risk to the insurer for financial protection. Risk management is not just financial protection and there is more to it, even though finance makes the core part in most cases. The same way, if we look at managing software projects, the project manager and sponsors had to deal with so many issues every now and then, before it was felt that preventing such issues coming along the way is better than dealing with such issues, which is what is risk management.

The risk managers or risk experts always think of a what if scenario for every action / decision so that all possible risks are identified early on and this in the past was thought to be creating ‘negative vibes’ and did not receive much support from the project sponsors. Because, when much of the risks are identified upfront, it might be so that the project may have to be shelved at the start itself. Here again, things have changed and most CxOs are accepting ‘failing fast’ a better option than failing at the end. Failing at start is an even better option. Refer my own blog on ‘failing at start’.

Given that most of the project sponsors and project managers have realized that risk management is better than its only alternative crisis management and are believing that risk management is a key area of project management, let us explore the key risk areas in a broader context that need a close watch which if not could impact the success of an end to end software project.

User Expectations

Even though a well written functional specifications exist, and the development team developing to that requirement, there is a potential risk of end users when they look at the final product go back and say that “this is not working in a way we want’, and pushing back the product for rework. This is mainly due to the fact that everything around the business is changing with time. The more time the development team take in involving the end users, the chances are very much likely that the expectation would have changed. Agile is the solution to address this risk area, where by the end users are participating in the development and small chunks of the product are delivered every now and then for user feedback.

There are more to it, most projects do not have the non functional requirements documented and much of the user expectations go around such software capabilities, for instance application performance is a key non functional requirement, which the development team is expected to take care of as part of. While the solution for this lies with the solution architect, the project manager and the stakeholders should not lose sight of this important area and should be managing the user expectations all through the project execution.

If one can identify or spot the potential risks around the user expectation and manage it well, the chances of the project successfully reaching the milestone is very high.

Technology Shocks

This is a broader risk area and could be broken down into many sub areas. Many projects hit a road block when it get closer to production deployment, by when the infrastructure team may find heavy investment in terms of hardware and software tools required to support the product in production. Some projects even faces issues in the early stages as well, as the development team may find some tools or technology not suitable for the given solution.

A well done pre-project risk assessment can help address this risk as the architects involves in such assessments can anticipate and call out such road blocks, which might help the project sponsors to take a call. Development teams in most cases would want to jump on to the project and start building everything themselves without considering re-usable off the shelf components being available for most capabilities. This tendency can add to the schedule risk, as the project may take longer due to technical issues that the team may face.

Managing risks in this area early on is very important as certain choices might be very difficult to reverse in the middle of the project. It could also be a case where implementing certain requirements with a given technology platform or tools could be much more complex than with certain other tools. Much of this responsibility lies with the Architects, who should do a good job to take the project pass through this risk area.

Skill gaps

While this item is to some extent related to technology shock, there is more to skill than the technology itself and that made me to call this out as a separate risk area itself. Soft skills play a key role in taking the project on the success path. Staff attrition is inevitable in software projects and as such managing the dependency on people is very important. The resources holding key roles should have the right attitude of hand holding the teams, willing to share the knowledge, quick and effective in on-boarding new members to the team.

Such skills of key resources holding the lead role even influence staff leaving the team or even the organization and it could be some of the best resources of the project team exiting for such reasons. The Project Sponsors should play an important role here in getting to know of such risk items and manage them well so as to keep the morale of the team high and get the best of the team.

Every member of the project should contribute towards the success of the project, keeping in mind the project goals and objectives. It is not uncommon that some key members of the project make certain decisions in such a way that is beneficial to him or them and in turn putting the success of the project at risk. This is a sort of political behaviour by some members within the project. Here again, the sponsors should involve more into the project and look for such risks spotted early on, so that control measures can be put in place by changing the team composition or by imparting necessary training or counselling to the needy members.

This third risk, when identified and managed well will ensure the team members collaborate and communicate well and deliver their best which eventually will contribute towards project success.

Lack of Risk awareness

Finally, lack of risk awareness by the project stakeholders is the biggest risk. This calls for a proper risk strategy and objectives at the organization level and at every project level and letting every member of the project to actively participate in risk identification and management.

While most project managers do mandate risk management as part of the project charter and do maintain a risk register, they fail to apply the risk management principles consistently, which eventually lead to incorrect risk prioritization. Not to be stressed, the controls and tasks identified to reduce the risk level also need to be monitored on par with other project tasks for timely actions. It is also a common mistake that the project managers do by missing out to estimate the efforts for risk management and not making it part of the project schedule.

Another important aspect of risk management, which is normally ignored is the communication and continuous monitoring. Risks need continuous monitoring and need different levels of communication or escalation depending on the risk level. Most projects have a stale risk register, where the risks are just identified and no monitoring or follow ups being done on them. Use of an appropriate risk management tool is recommended as it will ensure the visibility of the risks to all concerned with automatic alerts and escalations and also will facilitate consolidation of risks across multiple projects, there by facilitating managing risks at enterprise level.

Friday, May 18, 2012

Pre-project Reviews help projects fail at start


A new project was approved and a 15 member team sit round the table in the project kick off meeting with excitement and enthusiasm. Business Analysts have put together the stories which Developers have started developing. There were periodical project status reviews and there were issues and risks discussed in these meetings and the project manager did well in managing the issues and risks. There comes a message from stakeholders that all work on the project be stopped with immediate effect.

That may be sounding familiar to every IT familiar as study says that 37% of the IT projects are at the risk of failing. Another study finds that 31% of the projects are cancelled before even hitting the finish line.  It really hurts the project team members when a project is cancelled or shelved. But there could be reasons for doing so and such decisions are taken when continuing with the project will only increase the loss and would not bring in value for the sponsors. This is where ‘fail fast’ will help as some times pulling the project down even earlier would save a lot of efforts and money for the sponsors.

Let us see what can be done even before starting any work on a project, so that the potential failure is spotted in the pre-project stage itself so that the project is not allowed to start in the first place. When the need for a project is felt, the executive management (sometimes called Project Review Board) takes a look at it and reviews it and if it sees merit in it, gives a go for the project. In some cases, by the time the Project Review Board (PRB) sees the project proposal, considerable efforts would have already incurred in the form of requirement gathering and analysis. The review by the PRB members, when done well will bring out the ability to measure the risk exposure and the RoI (Return on Investment) of the project, which in turn influences the further decision. However, it is important here that the PRB members shall be presented with adequate information that helps taking the right decision. A well drafted checklist or template that captures all the required information would help not to miss out the details and will help reduce the projects failing down the road.

The project proposal template shall at a minimum capture the following details, so that an informed decision is taken by the PRB.

Motivation:

The problem the project is expected to solve or a business opportunity that the project will help the business to capitalize should be stated well, so that the PRB members are able to appreciate the motivation behind the project need. It would be appropriate to quantify the value / benefit the solution would bring when implemented as intended. Some projects may bring immediate benefits, whereas some may bring benefits in the longer term, in which case, the same shall be called out explicitly. Similarly some projects may bring in monetary benefits, while others may bring in intangible value / benefits.

Estimated investment:

It may not make sense if the investment to be made for the project is significantly higher, which may leave the value or benefit negligible. Most projects get hit on account of cost overrun. The estimate should be close to being accurate and use of a template will make sure that all cost elements are considered. In some cases, a better estimation can be made only after gathering requirements with sufficient details. It would be wise that in such cases, the PRB may take a call to sponsor the initial efforts alone and let the proposal be placed again for review with more accurate estimation.

Constraints:

All projects will be constrained with various ifs and buts. Each possible constraint should be identified and called out in the proposal document. Each constraint will have one more associated risk items for which a contingency plan and mitigation plan has to be put in place. Risk Management practice has evolved in recent times and there are methods and techniques with which the risks can be quantified (a factor of probability and impact) and the overall risk exposure of the proposed project can be measured. This will help the reviewers to take an informed decision whether this much risk is worth to be taken for the value this project might give back.

Solution longevity and re-usability:

It would help if the expected life of the solution is determined. Some of the solutions may have shorter life, but may offer the re-usability with minor changes / enhancements. This will have to be determined considering the longevity of the tools and technology that forms part of the solution. Considerable number projects get cancelled as the sponsors gets to know that the useful life of the solution is going to be short and that the project may not be completed on time leading to further reduction in the longevity.

The above are some of the key factors that influence the decision on the project. There are many other factors which depending on the nature and size of the project may have significant influence on the decision making. For instance, security and compliance requirements could be a significant risk, which the PRB needs to know of while taking the go decisions on projects. Other factors that may find a place in the Proposal document include, deployment infrastructure, post production maintenance aspects, choice of technology, resource availability, etc.

On top of everything, the team that prepares the project proposal document should have the expertise in the business domain, technology used, estimation and related skill areas. Typically this will require a team of architects of appropriate specialization to accomplish this.

References: